MMAR54432

Location Location!
Beachside Apartment in Carib Playa, just a stone throw away from the beautiful (Cabopino) Artola's Dunes & nature reserve.
A fantastic investment either as a forever home or to carry out rentals.
The property is distributed as follows:
A spacious living and dining area with open plan kitchen leading out to the "L-shape" terrace. There are 2 bedrooms and 2 bathrooms, of which one is en-suit.
Both bedrooms have access to the terrace.
The property comes with an underground car park and a storage room.
The Urbanisation 'Dunes Beach' has only two blocks which share a great size pool. There is also a gym for the exclusive use of the owners.
The property is 600metres from the beach, 10 minutes drive to Marbella centre & 30mins to Malaga airport.

MMVR8818

Property Highlights
•Stunning contemporary-modern design
•Sea views
•Off-plan project, with opportunity to customise
•Privileged location, yet close to amenities

The Location
•In a small but very pleasant community of luxury villas and apartments, amidst stunning natural beauty and with views towards the Mediterrean Sea.
•Surrounded by some of the most exclusive urbanisations in East Marbella.
•Walking distance or very short drive to a commercial centre with pharmacy, several restaurants, health store and supermarket and gym
•By car, it's 10 minutes to the centre of Marbella, 15 minutes to Puerto Banus.
•Plenty of golf resorts and courses are nearby with Cabopino Golf & Santa Maria Golf just a stone's throw away.

The Villa
•Very spacious and exclusive luxury villa
•South orientation, which is accentuated in the entire concept of the villa.
•Elegant, contemporary-modern design, based on the fusion of comfort and luxury with the surrounding natural beauty
•Stunning views towards the sea
•Built with quality materials and with sophisticated details.
•Utmost care will be paid to the esthetical aspects whilst also paying utmost attention to create an eco-friendly, low maintenance home.
•Opportunity to customize many aspects of the villa to your personal preferences.
•Building license should be granted during summer 2020
•Construction completion time of about 6 to 8 months